Question Detail

36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work ?

  • 24 days
  • 28 days
  • 34 days
  • 35 days
Similar Questions :

1. In a hostel, Food was available for 2000 students for 54 days, but after 15 days more students joined hostel and food lasts only for 20 more days. Determine how many students came in hostel ?

  • 1650
  • 1700
  • 1900
  • 2100

2. 4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat weavers in 8 days ?

  • 12
  • 14
  • 16
  • 18

3. An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metre of cloth ?

  • 194 seconds
  • 195 seconds
  • 196 seconds
  • 197 seconds

4. A flagstaff 17.5 metre high casts a shadow of length 40.25 metre. The height of building, which casts a shadow of length 28.75 metre under similar conditions will be :

  • 12 metre
  • 12.5 metre
  • 13.5 metre
  • 14 metre

5. If the price of 23 toys is 276, then what will the price of 12 toys ?

  • 144
  • 148
  • 156
  • 186
Read more from - Chain Rule Questions Answers